katianCarlanaj
katianCarlanaj katianCarlanaj
  • 21-11-2015
  • Chemistry
contestada

Which of the following is considered a major process flow structure?
a. Lean Manufacturing
b. Project
c. Fabrication
d. Lead Time

Respuesta :

frontloader13 frontloader13
  • 22-11-2015
Since lead time is the time period between the starting and completion of producing a product, lead time is a major process flow structure.
Answer Link

Otras preguntas

-1/6 times 5 times 2/7
The main concept behind mercantilism is
O ônibus espacial,preso sobre o avião está em movimento ou repouso?
What is the value of 3 1/2 - 9 3/4
a man sails 30 km from a port to a lighthouse Q on a bearing of 128 then he sails another 25 km to R on a bearing of 295 calculate the distance of pr
X^2-4X+??=(X-??)^2? Complete the square to form a true equation
in the rock cycle what process leads to the formation of sediment?
In Japan, growers have developed ways of growing watermelon cubes that fit into small refrigerators. Suppose you cut one of these watermelon cubes open using on
I don't understand the question ... find an equation for the line with an x intercept of 4 and a y intercept of -2
How is 4^m times 4^n different from (4^m)^n?