belen1843 belen1843
  • 25-08-2022
  • Computers and Technology
contestada

The deliverable of the system _____________ phase is the set of technical system specification.

Respuesta :

adlynchand3
adlynchand3 adlynchand3
  • 28-08-2022

Answer:

the best answer is design

Answer Link

Otras preguntas

In only 15 minutes, the temperature in Fort Assiniboine, Montana, went from -5°F to +37°F on January 19, 1892. Calculate this change in temperature in kelvins.
Which ordered pair is the solution to the system of equations? 2x+y=-8 x-y=-4 A. (−3, −2) B. (−1, 3) C. (1, 5) D. (−4, 0)
Draw a example Of a diameter
write a real-world problem to add like fractions. then solve the problem.
20-[6b-(4a+2b)] simplified
How many yards must you run to complete a 100 meter dash?
what is .574 as a fraction
What equals 28 in times tables?
There are 24 balls in a large bin. Two out of every three are basketball. The rest are footballs. How many basketballs are in the bin?
Which of the following structures would you expect to find in a single-celled organism? A. internal organs B. legs and feet C. outer covering D. large brai