A construction company needs to remove 4 3/4 tons of dirt from a construction site. they can remove 5/6 tons of dirt each hour. What os the total number of hours will take to remove the dirt? ( write your answer as a mixed number in simplest form )

Respuesta :

veeveejoys
veeveejoys veeveejoys
  • 27-03-2022

Answer:

5.7 hours

Step-by-step explanation:

Divide 4 3/4 by 5/6 hope this helps! :)

Answer Link

Otras preguntas

what is the answer to w/2 +7=w/3+9?
All decrease in the magnitude of velocity is called
Which of the Benelux countries would be most affected by climate change and melting polar ice caps?
taxonomy is the study of what?
How do you start an evaluation on a TV show?
Unrealistic portrayals of slim bodies can encourage people to lose an unhealthy amount of weight. Being underweight or malnourished can lead to
How many protons does an iron atom have
Which of the following is considered the oldest civilization in Mesoamerica? A. the Aztec B. the Inca C. the Olmec D. the Maya
Helppppppp look at my questions plz
if you are having trouble getting a fire started in the barbecue grill, a common response is to blow on the coals until the fire begins to burn better. however,