GrimReaper666 GrimReaper666
  • 23-02-2021
  • Mathematics
contestada

Robert takes 10 days more than Peter to complete a job. If they work together they will
complete the job in 12 days. How long will Peter alone take to finish the job?

Respuesta :

dede70800 dede70800
  • 23-02-2021

Answer:

I believe the answer is 2

Step-by-step explanation:

Answer Link

Otras preguntas

A rectangle is 5 units long. The rectangle is also 3 units wide. What is its perimeter?
Which mathematical sentence most accurately expresses the information in the problem below? Crystal has 100 compact discs that she wants to put into boxes each
$10 + ($6-n) if n =$3 What is the final product Of this mathematical question?
What is the initials for sodium chloride
the kind of lake that formed when a river meanders
How did its first pharaoh unify Egypt
Why do the oceans play such a large part in the water cycle
homophones for the words insignificant and small.  has to be 5 letters
What are the prime numbers of numbers 1-49?
A drawing of a surfboard in a catalog shows it's length as 8 4/9 inches. Find the actual length of the surfboard if 1/2 inch length on the drawing corresponds t