A system has three components in parallel with reliabilities 0.9, 0.7, and 0.5. System reliability is:______

a. 0.315
b. 0.700
c. 0.900
d. 0.985
e. 2.100

Respuesta :

Ritmeks
Ritmeks Ritmeks
  • 23-12-2020

Answer:

0.985

Explanation:

A system contains three components that are arranged in parallel, they include 0.9, 0.7 and 0.5

Therefore the system reliability can be calculated as follows

= 1 - (1 -0.9)×(1-0.7)×(1-0.5)

= 1 - 0.1×0.3×0.5

= 1 - 0.1×0.15

= 1 -0.015

= 0.985

Hencd the system reliability is 0.985

Answer Link

Otras preguntas

jamon en el desayuno? pollo en el almuerzo? y bistec? Debes comer mas​
I need help with my hw ​
Suppose a particle has 4 protons, 5 neutrons, and 2 electrons. What is its charge?
Suppose Jose wants to find out more about the surface of the moon. He would find most of his information __________. A. In a magazine article that outlines the
war against the week chapter 1 summary
Jill's family went out for dinner. The total dinner check was $49.37. Jill's dad left an 18% tip. About how much tip did Jill's dad leave?
identify the interjection in this sentence I can't wait for our field trip to the science museum oh boy​
4Fe + 3O2 --> 2Fe2O3 Calculate the volume of oxygen needed to react with 323 g Fe. The student submitted the following answer. Identify their mistake and giv
How many languages are spoken in Africa? * 10 points less than 25 between 25 and 100 between 100 and 1,000 more than 1,000
Based on the scatterplot below what is the most likely value for “Pounds of Apples” when “Number of Apples” is 60?