Jez2005
Jez2005 Jez2005
  • 22-09-2016
  • Mathematics
contestada

A construction company is digging a hole for a swimming pool. the hole will be 12 yards long,7 yards wide, and 3 yards deep. how many cubic yards of dirt will the company neet to remove?

Relax

Respuesta :

LittleMissBrill
LittleMissBrill LittleMissBrill
  • 22-09-2016
12*7*3= 252 I think..
Answer Link

Otras preguntas

12yd/min_______ ft/s
What percent of 240 is 32?
How do you spell baguette in French
The second angle of a triangular field is three times as large as the first angle. the third angle is 40⁰ greater than the first angle. How long are the angles?
Hi I've been given the question "Work out 84kg as a percentage of 120kg" please can somebody tell me how to do this? Thanks.
which is the highest mountain in the world
A farmer set out to travel on a 170 km stretch of lonely prairie highway at an average speed of 105 km/h. he was more than halfway across when his car broke dow
A football team gained 9 yards on one play and then lost 22 yards on the next. Write a sum of integers to find the overall change in field position?
What is the absolute value of |-7|
what is the major assumption underlying in the first sentence of The Declaration of Independence