D6otty1mejimtaije
D6otty1mejimtaije D6otty1mejimtaije
  • 21-09-2016
  • Physics
contestada

Calculate how much work you need to move a 280 N shed to a platform 5 m above.
A 2,800 J
B. 1,400 J*
C. 56 J

Respuesta :

taskmasters
taskmasters taskmasters
  • 23-09-2016
Work is done when a motion resulted from the force being done by an object. The amount of work done is calculated by multiplying the force applied and the distance traveled. It is calculated as follows:

Work = Force x distance = 280 N x 5 m  =  1400 J.
Answer Link

Otras preguntas

Cereal originally Cost three dollars. The store has reduce the price by 25%. You have a coupon for additional 20% off the already discounted price. What is the
Please help Johnny went to the pumpkin patch to buy a large pumpkin. The price of the pumpkins were 0.45 per pound. Since it was large he asked them to deliver
Is true that the answer is d
I was at home at that hour and writing in my study; and although my French windows face towards Ottershaw and the blind was up (for I loved in those days to loo
What is the relative minimum of the function ?
N STANDS FOR A WHOLE NUMBER 2n is greater than 30 5n is less than 100 Write all the Numbers that n stands for
Which is the most accurate analysis of the two topics in this story?
How does Wiesel use foreshadowing in the story of Mrs. Schächter?
if f(x)=2x^2+3x+1 and g(x)=x+5, what would f(g(x)) a.) 2x^2+17x+36 b.) 2x^2+17x+66 c.) 2x^2-3x+6 d.) 2x^2-3x+36
Use the letters A and B to illustrate binary and ternary form. Binary: ___ ____ Ternary: ____ _____ _____