branimirthegreat0911
branimirthegreat0911 branimirthegreat0911
  • 25-07-2020
  • Mathematics
contestada

A person can do a job in 6 days. Another can do the same job in 4 days. If they work together, how long do they need to finish the job?

Respuesta :

wegnerkolmp2741o
wegnerkolmp2741o wegnerkolmp2741o
  • 25-07-2020

Answer:

2.4 days

Step-by-step explanation:

Time working together,t ,is

1/t = 1/a+ 1/b  where a and b is the times working alone

1/t = 1/4 + 1/6

Multiply each side by 12t to clear the fractions

12t( 1/t )= 12t(1/4 + 1/6)

12 = 3t+2t

12 = 5t

Divide by 5

12/5 = 5t/5

2 2/5 =t

2.4 days

Answer Link
635624
635624 635624
  • 25-07-2020

Answer:

2.4 days

Step-by-step explanation:

i just took a test and got a 100%

Answer Link

Otras preguntas

What is the answer to tho equation ???
On the surface of planet y, which has a mass of 4.83x1024 kg, a 30.0 kg object weighs 50.0 n. what is the radius of the planet?
what was megara know for
In sexual reproduction, an offspring is produced with genes from both parents. When the offspring has a new genetic variation that it got from neither of its pa
A particle initially located at the origin has an acceleration of vector a = 2.00ĵ m/s2 and an initial velocity of vector v i = 9.00î m/s.(a) find the vector po
If atp is present in relatively high amounts, what is likely to happen to the rate of glycolytic activity in that cell?
factor the following polynomial completely 30y^6+25y^5-10y^4
(15 points) what strengthens cardboard
the initial price for a horse is $39000.It is discounted by 40% and then by further 14%.Find the price of the item.
PLEASE HELP NEED ASAP GIVING OUT BRAINLIEST 50 points!!!!