destinywyatt98411 destinywyatt98411
  • 26-03-2024
  • Mathematics
contestada

Alpha can do a piece of work in 20 days. beta is 25% more efficient than alpha. The number of days taken by beta to do the same piece of work is
a. 15
b. 16
c. 18
d. 25

Respuesta :

Otras preguntas

Does anyone know the answer to the question ​
Question 11 and 12 please help
Beck uses 25 robux to buy 3 spins on a game she likes, she spends 8 thousand robux to finally roll a good item.How much spins did she get?
These are my last 2 questions if anybody knows them pls! :)
Write an equation for the line parallel to g(x) = 4x + 5 and passing through the point (10,7). Write the answer in slope-intercept form.
Find the slope of each line passing through the given points using the slope formula. ( 0, -6 ) and ( -2 , 8 )
A field goal kicker was successful 75% of the time. He made 51 field goals. How many kicks did he made in total?
Write the equation of the line, given the y- and x-intercepts. b x-intercept (–6, 0), y-intercept (0, –8)
What is the equation of the line graphed below?
3×2 what does it equal