jdsfdujfi6387 jdsfdujfi6387
  • 23-01-2024
  • Mathematics
contestada

For a particular work, the efficiency of A is 66.67% more than that of B. If both of them working together can complete 88.88% of the work in 10 days, in how many days B alone can complete the work?
A) 18
B) 20
C) 22
D) 24

Relax

Respuesta :

Otras preguntas

the table represents a linear equation . which equation correctly uses point(-2,-6) to write the equation of this line in point-slope form ?A. y-6=5/2(x-2)B. y
How many babies were born at the puyallup assembly center?
Explain how the basic structure of an atom has led to the diversity of compounds making up living and nonliving things
A constitution was drafted at A.bastille B.the estates general C.a tennis court D.versailles
In buffalo, New York,temperature was -14 degrees F in the morning. if the temperature dropped 7 degrees F, what is the temperature now?
Determine the volume of a cube whose width is 32.1 cm. Round your answer to the correct number significant figures.
Find the product.(4s+2)(6s^2-s+2)
Round each number to the nearest ten. 419
A dot density map uses dots to show the
The equation y=ax describes the graph of a line