puddingking7724 puddingking7724
  • 22-01-2024
  • Engineering
contestada

The most commonly used additive to help concrete set rapidly and more cohesively is:

Relax

Respuesta :

Otras preguntas

Larry works 15 days for a total of 532.25 hours.How many hours did he average per day?
Describe the steps involved in closing the books. What’s is the most important output of the accounting cycle? What would happen if the books were never closed?
if a = 9x to the second power+4 and b= 3x+ 2 what is a in terms of b
using the map above, what number is on the state with the capital city of trenton
With the drain open, a pool loses water at a rate of 9 gallons per minute. At that rate, how long will it take to drain 486 gallons of water?
Which of the following is the correct S I unit to use in measuring the mass of a boulder
Which units express heat capacity?
A former governor would be most likely to hold which of the following jobs? A) U. S SenateB) Secretary of EducationC) Vice President of the U. SD) Business exe
listen to this selection answer the question: comment est mon cousin? Il est
The following sentence has a dangling modifier. Noticing that it had been turned over by the storm, the patio table was flipped back on its feet. Which revis