louie4285 louie4285
  • 25-05-2023
  • Business
contestada

An engineering firm recently conducted a study to determine its benefit (B)and cost (C) structure. The results of the study are as follows: B(Y) = 300Y - 6Y² C(Y)=4Y² So that MB = 300 - 12Y and MC = 8Y. You have been asked to determine the maximum level of net benefits and the level of Y that will yield that result.

Relax

Respuesta :

Otras preguntas

Can y'all please tell me what organelle this is
latoya surveyed her friends to see how many pets they own. Her 6 friends have a total of 11 cats and birds. If there are a total of 36 legs how many cats and bi
Arlene is showing her work in simplifying −7.9 + 8.2 − 3.4 + 2.1. Identify any errors in her work or in her reasoning. Write feedback to Arlene explaining the m
algebraic espression of seven less than a number is fifteen
A figure is translated using the rule (x,y). => (x-3,y+6)
A truck traveled 205 miles in 3/12 hours. The distance is the product of the rate and the time. To the nearest tenth, what is the average speed of the deliver
If f(x) = |-3x - 6| - 10, find f(5)
I have to finish this packet for tomorrow and I need help with this question
can someone please do this for me
What does a equal in this equation 2a-5=10