Einstein1642 Einstein1642
  • 25-05-2023
  • Business
contestada

List 8 activities and do PERT project, use activity one node (AON), not activity on arch. Do a PERT graph, find the critical path and assume on a scenario of uncertainty, so we can apply a cost-benefit analysis to crashing or not crashing or what activity to crash.

Relax

Respuesta :

Otras preguntas

Which was included in England's Bill of Rights in 1689? A. legal tolerance for Catholics, Jews, and Muslims B. the first promise of trial by jury in Engla
Which of the following can regulate gene expression in eukaryotes? A transcription factor b plasmids c lipids d lac operons
what two numbers multiply to 80 and add up to 9?
During a controlled experiment, no fewer than 2 factors are tested at one time. True False
136รท6 between what two numbers and is about what
Can you please help me? Explain each with answer please. See attacment.
P=a+8+c how do I solve for c?
If your speed changes from 10 km/h to 6 km/h, you have a(n) ______ acceleration. a. negative c. neutral b. positive d. oscillating
What makes an area a biodiversity hot spot? A. high diversity and medicine B. high diversity and food C. many endemic species and medicine D. many endemic speci
A square calendar has sides that are 9 inches long. What is the calendar area?