nolanbarrows7900 nolanbarrows7900
  • 23-12-2022
  • Business
contestada

the following represents a project with known activity times. all times are in weeks. activity immediate predecessor time a -- 4 b -- 3 c a 2 d b 7 e c, d 4 f b 5 g e, f 4 01. what is the minimum possible time required for completing the project?

Relax

Respuesta :

Otras preguntas

Who was the president from 1933 to 1945, the only president to serve more than 8 years in office?
how many rows of 3 are in 21
how is euphemism related to connotative meaning.
A bowling ball has a total diameter of 8.5 in. It consists of 2 parts. The inside is a spherical core with a diameter of 6 in.Surrounding the core is a layer of
Which European colonial power controlled India? A. Belgium B. France C. Great Britain D. Germany
if 75% of a number is 60, what is 20% of the number
I have 15 hundreds, 14 tens, 3 ones, 7 tenths, and 16 hundredths. what number am I
The plays of Tennessee Williams ___ the same themes over and over again: secrecy, frustration, and anguish. A. ostensible B. reiterate C. reticent D. retrospect
Why were “separate but equal” schools often unfair to African Americans?
What is the kinetic energy of an object that has a mass of 30 kilograms and moves with a velocity of 20 m/s?