michaelfash42 michaelfash42
  • 24-09-2022
  • Mathematics
contestada

A project is budgeted for 2400 hours and will last 3 weeks. Technicians will cover 25% of the project for the first week and then 60% for the final two weeks. If each technician normally works 40 hours per week, how many technicians are there?*

Relax

Respuesta :

Otras preguntas

5.89 5.899 <,>or = help
What does x equal if 2.3-5x=3x-5.7 and can you please explain how to do this thanks?
Michael made a baby quilt that was 3 feet wide. Its Perimeter was 16 feet what was its Area.  Show me the steps.  Thanks
True or false. Thomas Edison created the light bulb?
3m(2m+9)=0 what is the factor of m
why did andrew jackson want the indians to leave their tribes
Could the last carbon atom chain make bonds with four hydrogen atoms?why or why not?
what were some characteristics of Aryan culture ?
As viewed from a cliff 340 feet above sea level, a ship is 450 feet from the shore. What is the angle of depression from the cliff to the ship on the water belo
In 1904, the Supreme Court ruled that which of the following was a “combination in restraint of trade”? (A) Sherman Antitrust Act (B) AFL (C) Grange Movement (D